Gretna Pipeline Construction

May 2017 - September 2017     TasWater 4M

Construction of up to 15km of new pipeline from Bushy Park to Gretna – pipeline constructed from the Fenton Main to the TasWater WTP and from the WTP to the existing Gretna Reservoir, including bridge crossings and the use of horizontal direction drilling technique

Installation of a new constant pressure pump station at Gretna Reservoir.

 

Upgrade existing 2km of water reticulation system at Gretna by combination of open trenching and horizontal directional drilling. A pressure reducing valve has also been installed for each property connection.